PDF下载/HTML 分享
[1]王 宁,等.地铁盾构施工人因可靠性分析的加权模糊CREAM 模型 [J].天津大学学报(自然科学版),2019,(02):200-210.[doi:10.11784/tdxbz201803014]
 Wang Ning,Du Xiuli,et al.A Weighted Fuzzy CREAM Model for Human Reliability Analysis in Shield Tunneling [J].Journal of Tianjin University,2019,(02):200-210.[doi:10.11784/tdxbz201803014]
点击复制

地铁盾构施工人因可靠性分析的加权模糊CREAM 模型

参考文献/References:

[1] 钱七虎,戎晓力. 中国地下工程安全风险管理的现状、问题及相关建议[J]. 岩石力学与工程学报,2008,27(4):649-655.Qian Qihu,Rong Xiaoli. State,issues and relevant recommendations for security risk management of China underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering , 2008 , 27(4) : 649-655(in Chinese).
[2] 郑新定,王红卫,周 健. 考虑人为因素的盾构隧道风险分析和控制模型研究[J]. 隧道建设,2013,33(9):720-725. Zheng Xinding,Wang Hongwei,Zhou Jian. Risk analysis and control model for shield tunnel based on human factors[J]. Tunnel Construction,2013,33(9):720-725(in Chinese).
[3] 邵根大. 杭州地铁工地坍塌事故的警示[J]. 现代城市轨道交通,2009(1):1-3. Shao Genda. Warning of collapse accident of construction site in Hangzhou metro[J]. Modern Urban Transit,2009(1):1-3(in Chinese).
[4] 周志鹏,李启明,邓小鹏,等. 基于事故机理和管理因素的地铁坍塌事故分析——以杭州地铁坍塌事故为实证[J]. 中国安全科学学报,2009,19(9):139-145. Zhou Zhipeng,Li Qiming,Deng Xiaopeng,et al. Analysis of metro collapse accidents based on accident mechanism and management factors:With the collapse
of Hangzhou metro as an example[J]. China Safety Science Journal,2009,19(9):139-145(in Chinese).
[5] Swain A D,Guttman H E. Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications[R]. Washington DC:US Nuclear Regulatory Commission,1982.
[6] Haney L N,Blackman H S,Bell B J,et al. Comparison and Application of Quantitative Human Reliability Analysis Methods for the Risk Methods Integration and Evaluation Program(RMIEP):Final Report[R]. Specific Nuclear Reactors & Associated Plants,1989.
[7] Hollnagel E. Cognitive Reliability and Error Analysis Method[M]. Oxford:Elsevier,1998.
[8] Akyuz E,Celik M. Application of cream human reliability model to cargo loading process of LPG tankers[J]. Journal of Loss Prevention in the Process Industries,2015,34:39-48.
[9] 柴 松,余建星,杜尊峰,等. 海洋工程人因可靠性定量分析方法与应用[J]. 天津大学学报,2011,44(10):914-919. Chai Song,Yu Jianxing,Du Zunfeng,et al. Quantitative human reliability analysis methods and application of offshore engineering[J]. Journal of Tianjin University,2011,44(10):914-919(in Chinese).
[10] Calhoun J,Savoie C,Randolph-Gips M,et al. Human reliability analysis in spaceflight applications,part 2:Modified CREAM for spaceflight[J]. Quality & Reliability Engineering International,2014,30(1):3-12.
[11] Fujita Y , Hollnagel E. Failures without errors :Quantification of context in HRA[J]. Reliability Engineering & System Safety,2004,83(2):145-151.
[12] He X,Wang Y,Shen Z,et al. A simplified CREAM prospective quantification process and its application [J]. Reliability Engineering & System Safety , 2008 ,93(2):298-306.
[13] Sun Z,Li Z,Gong E,et al. Estimating human error probability using a modified CREAM[J]. Reliability Engineering & System Safety,2012,100:28-32.
[14] Konstandinidou M,Nivolianitou Z,Kiranoudis C,et al. A fuzzy modeling application of CREAM methodology for human reliability analysis[J]. Reliability Engi
neering & System Safety,2006,91(6):706-716.
[15] Marseguerra M,Zio E,Librizzi M. Human reliability analysis by fuzzy“CREAM”[J]. Risk Analysis,2010,27(1):137-154.
[16] Ung S T. A weighted CREAM model for maritime human reliability analysis[J]. Safety Science,2015,72:144-152.
[17] Baziuk P A,Rivera S S. Fuzzy human reliability analysis: Applications and contributions review[J]. Advances in Fuzzy Systems,2016(3):1-9.
[18] Yang Z L,Bonsall S,Wall A,et al. A modified CREAM to human reliability quantification in marine engineering[J]. Ocean Engineering,2013,58(1):
293-303.
[19] 杨 宇. 多指标综合评价中赋权方法评析[J]. 统计与决策,2006(13):17-19. Yang Yu. Analysis on determining weight method in multi-index comprehensive evaluation[J]. Statistics and Decision,2006(13):17-19(in Chinese).
[20] Yang J B,Singh M G. An evidential reasoning approach for multiple-attribute decision making with uncertainty[J]. IEEE Transactions on Systems Man & Cybernetics,1994,24(1):1-18.
[21] GB 50715—2011 地铁工程施工安全评价标准[S]. 北京:中国计划出版社,2011. GB 50715—2011 Standard for Construction Safety Assessment of Metro Engineering[S]. Beijing:China Planning Press,2011(in Chinese).
[22] GB 50652—2011 城市轨道交通地下工程风险管理规范[S]. 北京:中国计划出版社,2011. GB 50652—2011 Code for Risk Management of Underground
Works in Urban Rail Transit[S]. Beijing:China Planning Press,2011(in Chinese).
[23] GB 50446—2017 盾构法隧道施工与验收规范[S]. 北京:中国建筑工业出版社,2017.GB 50446—2017 Code for Construction and Acceptance of Shield Tunneling Method[S]. Beijing:China Architecture & Building Press,2017(in Chinese).
[24] Liu J,Yang J,Jin W,et al. Engineering system safety analysis and synthesis using fuzzy rule-based evidential reasoning approach[J]. Quality & Reliability Engineering International,2010,21(4):387-411.
[25] Yang Z L,Wang J,Bonsall S,et al. Use of fuzzy evidential reasoning in maritime security assessment[J]. Risk Analysis,2010,29(1):95-120.
[26] Wickens C D,Lee J,Liu Y D,et al. Introduction to Human Factors Engineering[M]. 2nd ed. New Jersey:
Prentice-Hall Inc,2003.

相似文献/References:

[1]柴 松,余建星,杜尊峰,等.海洋工程人因可靠性定量分析方法与应用[J].天津大学学报(自然科学版),2011,(10):914.
[2]柴 松,余建星,马维林,等. 基于CREAM 和不确定推理的人因可靠性分析方法[J].天津大学学报(自然科学版),2012,(11):958.
 CHAI Song,YU Jian-xing,MA Wei-lin,et al. A Human Reliability Analysis Method Based on CREAMand Uncertain Reasoning[J].Journal of Tianjin University,2012,(02):958.

备注/Memo

通信作者:许成顺,xuchengshun@bjut.edu.cn.

更新日期/Last Update: 2019-01-22