[1]钟登华,王志宁,关涛,等.基于增强现实的心墙堆石坝施工进度可视化仿真[J].天津大学学报(自然科学版),2018,(10):1072-1085.[doi:10.11784/tdxbz201710028]
 Zhong Denghua,Wang Zhining,Guan Tao,et al.Visual Simulation of Construction Schedule for Core Rock-Fill Dam Based on Augmented Reality[J].Journal of Tianjin University,2018,(10):1072-1085.[doi:10.11784/tdxbz201710028]
点击复制

基于增强现实的心墙堆石坝施工进度可视化仿真

参考文献/References:

[1] 钟登华, 张发愈, 李明超, 等. 面向对象的堆石坝施工系统仿真与优化研究[J]. 水力发电, 2003, 33(3):87-89.
Zhong Denghua, Zhang Fayu, Li Mingchao, et al. Object-oriented system simulation and optimization research for rock-filled dam construction[J]. Water Power, 2003, 33(3):87-89(in Chinese).
[2] Zhong Denghua, Zhang Ping, Wu Kangxin. Theory and practice of construction simulation for high rock-fill dam[J]. Science in China Series E:Technological Sciences, 2007, 50(1):51-61.
[3] 钟登华, 张平. 基于实时监控的高心墙堆石坝施工仿真理论与应用[J]. 水利水电技术, 2009, 40(8):103-107.
Zhong Denghua, Zhang Ping. Theory and application of construction simulation for high core rock-fill dam based on real-time monitoring[J]. Water Resources and Hydropower Engineering, 2009, 40(8):103-107(in Chinese).
[4] 钟登华, 赵晨生, 张平. 高心墙堆石坝坝面碾压施工仿真理论与应用[J]. 中国工程科学, 2011, 13(12):28-32.
Zhong Denghua, Zhao Chensheng, Zhang Ping. Theory and application of construction simulation for roller compaction of high core rock-fill dam[J]. Engineering Sciences, 2011, 13(12):28-32(in Chinese).
[5] Al-Hussein M, Niaz M A, Yu Haitao, et al. Integrating 3D visualization and simulation for tower crane operations on construction sites[J]. Automation in Construction, 2006, 15(5):554-562.
[6] Mawlana M, Vahdatikhaki F, Doriani A, et al. Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects[J]. Automation in Construction, 2015, 60:25-38.
[7] Elnimr A, Fagiar M, Mohamed Y. Two-way integration of 3D visualization and discrete event simulation for modeling mobile crane movement under dynamically changing site layout[J]. Automation in Construction, 2016, 68:235-248.
[8] Wang Weichih, Weng Shaowei, Wang Shihhsu, et al. Integrating building information models with construction process simulations for project scheduling support [J]. Automation in Construction, 2014, 37(6):68-80.
[9] Brito D M, Ferreira E A M. Strategies for representation and analyses of 4D modeling applied to construction project management[J]. Procedia Economics & Finance, 2015, 21(1):374-382.
[10] Park J, Cai H, Dunston P S, et al. Database-supported and web-based visualization for daily 4D BIM[J]. Journal of Construction Engineering and Management, 2017, 143(10):04017078.
[11] Li Xue, Xu Jing, Zhang Qun. Research on construction schedule management based on BIM technology[J]. Procedia Engineering, 2017, 174:657-667.
[12] 钟登华. 可视化仿真技术及其应用[M]. 北京:中国水利水电出版社, 2002.
Zhong Denghua. Visual Simulation Technology and Its Application[M]. Beijing:China Water & Power Press, 2002(in Chinese).
[13] 胡程顺, 钟登华, 张静, 等. 土石方动态调配模型与可视化研究[J]. 中国工程科学, 2003, 5(12):73-79.
Hu Chengshun, Zhong Denghua, Zhang Jing, et al. Study on the model and its visualization for dynamic allocation of earth[J]. Engineering Sciences, 2003, 5(12):73-79(in Chinese).
[14] 钟登华, 胡程顺, 张静. 高土石坝施工系统可视化仿真与应用研究[J]. 水利水电技术, 2004, 35(12):50-55.
Zhong Denghua, Hu Chengshun, Zhang Jing. Visualization smiulation for embankment dam construction and its application[J]. Water Resources and Hydropower Engineering, 2004, 35(12):50-55(in Chinese).
[15] 刘宁, 钟登华, 张平. 高心墙堆石坝施工现场交通可视化仿真研究[J]. 水利水电技术, 2012, 43(4):73-78.
Liu Ning, Zhong Denghua, Zhang Ping. Study on visualized simulation of in-situ traffic for construction of high rock-fill dam with core[J]. Water Resources and Hydropower Engineering, 2012, 43(4):73-78(in Chinese).
[16] 钟登华, 张琴娅, 杜荣祥, 等. 基于CATIA的心墙堆石坝施工动态仿真[J]. 天津大学学报:自然科学与工程技术版, 2015, 48(12):1118-1125.
Zhong Denghua, Zhang Qinya, Du Rongxiang, et al. Dynamic construction simulation of core rock-fill dam based on CATIA platform[J]. Journal of Tianjin University:Science and Technology, 2015, 48(12):1118-1125(in Chinese).
[17] 钟登华, 张元坤, 吴斌平, 等. 基于实时监控的碾压混凝土坝仓面施工仿真可视化分析[J]. 河海大学学报:自然科学版, 2016, 44(5):377-385.
Zhong Denghua, Zhang Yuankun, Wu Binping, et al. Simulation and visual analysis for construction of storehouse surface of RCC dam based on real-time monitoring [J]. Journal of Hohai University:Natural Sciences, 2016, 44(5):377-385(in Chinese).
[18] 钟登华, 陈永兴, 常昊天, 等. 沥青混凝土心墙堆石坝施工仿真建模与可视化分析[J]. 天津大学学报:自然科学与工程技术版, 2013, 46(4):285-290.
Zhong Denghua, Chen Yongxing, Chang Haotian, et al. Construction simulation modeling and visual analysis of rockfill dam with asphalt concrete core[J]. Journal of Tianjin University:Science and Technology, 2013, 46(4):285-290(in Chinese).
[19] 钟登华, 谷金操, 佟大威. 水电站厂房及设备可视化交互仿真建模方法与应用[J]. 天津大学学报:自然科学与工程技术版, 2014, 47(2):95-100.
Zhong Denghua, Gu Jincao, Tong Dawei. Method and application of visual interactive simulation modeling for hydropower house and its equipment[J]. Journal of Tianjin University:Science and Technology, 2014, 47(2):95-100(in Chinese).
[20] 刘东海, 钟登华, 郑家祥. 数字化截流及其三维动态可视化仿真[J]. 天津大学学报, 2004, 37(4):298-302.
Liu Donghai, Zhong Denghua, Zheng Jiaxiang. River closure digitalization and three-dimensional dynamic visual simulation[J]. Journal of Tianjin University, 2004, 37(4):298-302(in Chinese).
[21] 钟登华, 练继亮, 朱慧蓉. 混凝土坝浇筑过程三维动态可视化仿真[J]. 天津大学学报, 2004, 37(1):45-49.
Zhong Denghua, Lian Jiliang, Zhu Huirong. 3D dynamic visual simulation of concrete dam construction [J]. Journal of Tianjin University, 2004, 37(1):45-49(in Chinese).
[22] Sutherland I E. A head-mounted three dimensional display[C]//AFIPS Joint Computer Conference. San Francisco, USA, 1968:757-764.
[23] Webster A, Feiner S, Macintyre B, et al. Augmented reality in architectural construction, inspection, and renovation[J]. American Society of Civil Engineers, 1996:913-919.
[24] Azuma R T. A survey of augmented reality[J]. Presence:Teleoperators and Virtual Environments, 1997, 6(4):355-385.
[25] Behzadan A H, Dong Suyang, Kamat V R. Augmented reality visualization:A review of civil infrastructure system applications[J]. Advanced Engineering Informatics, 2015, 29(2):252-267.
[26] Carozza L, Valero E, Bosché F, et al. UrbanPlanAR:BIM mobile visualisation in urban environments with occlusion-aware augmented reality[C]//Lean and Computing in Construction Congress-Joint Conference on Computing in Construction. Heraklion, Greece, 2017:229-236.
[27] Haynes P, Lange E. Mobile augmented reality for flood visualisation in urban riverside landscapes[J]. Journal of Digital Landscape Architecture, 2016:254-262.
[28] Mcclean E, Cao Y, Mcdonald J. Single image augmented reality using planar structures in urban environments[C]//2011 Irish Machine Vision and Image Processing Conference. Dublin, Ireland, 2014:1-6.
[29] Golparvar-Fard M, Pe?a-Mora F, Savarese S. D4AR-a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication[J]. Journal of Informa-tion Technology in Construction, 2009, 14(13):129-153.
[30] Golparvar-Fard M, Pe?a-Mora F, Savarese S. Automated progress monitoring using unordered daily construction photographs and IFC-based building information models[J]. Journal of Computing in Civil Engineering, 2012, 29(1):04014025.
[31] Law A M, Kelton W D. Simulation Modeling and
Analysis[M]. New York:McGraw Hill Book Co, 2000.
[32] Halpin D W. Cyclone:Method for modeling of job site processes[J]. Journal of the Construction Division, 1977, 103(3):489-499.
[33] 钟登华, 胡程顺. 复杂工程系统可视化仿真建模方法与应用[J]. 系统仿真学报, 2012, 14(7):839-843.
Zhong Denghua, Hu Chengshun. Theory and applica-tion of visual simulation modeling for complex engineer-
ing system[J]. Acta Simulata Systematica Sinica, 2002, 14(7):839-843(in Chinese).
[34] Fujimoto R M. Parallel discrete event simulation[J]. Communications of the ACM, 1989, 33(4):30-53.
[35] 刘珊珊, 周宜红, 刘全, 等. 堆石坝施工的实时动态仿真系统研究[J]. 系统仿真学报, 2004, 16(11):2525-2528.
Liu Shanshan, Zhou Yihong, Liu Quan, et al. Real-time dynamic simulation system of rock-fill dams[J]. Journal of System Simulation, 2004, 16(11):2525-2528(in Chinese).
[36] Kalman R E. A new approach to linear filtering and prediction problems[J]. Journal of Basic Engineering Transactions, 1960, 82:35-45.
[37] 钟登华, 王飞, 吴斌平, 等. 从数字大坝到智慧大坝[J]. 水力发电学报, 2015, 34(10):1-13.
Zhong Denghua, Wang Fei, Wu Binping, et al. From digital dam toward smart dam[J]. Journal of Hydroelectric Engineering, 2015, 34(10):1-13(in Chinese).

相似文献/References:

[1]杜荣祥,钟登华,关涛,等.考虑仓面实时监控厚度影响的堆石坝仓面施工仿真[J].天津大学学报(自然科学版),2018,(04):348.[doi:10.11784/tdxbz201611056]
 Du Rongxiang,Zhong Denghua,Guan Tao,et al.Simulation Method of Rockfill Dam Based on Influence of Storehouse Thickness of Digital Monitoring[J].Journal of Tianjin University,2018,(10):348.[doi:10.11784/tdxbz201611056]

备注/Memo

收稿日期: 2017-10-31; 修回日期: 2017-12-20.
作者简介: 钟登华(1963—), 男, 教授, 博士生导师, 中国工程院院士, dzhong@tju.edu.cn.
通讯作者: 关涛, tao.guan@tju.edu.cn.
基金项目: 国家自然科学基金雅砻江联合基金资助项目(U1765205); 国家自然科学基金创新群体基金资助项目(51621092); 国家自然科学基金资助项目(51439005).
Supported by the Yalong River Joint Funds of the National Natural Science Foundation of China(No.,U1765205), the Innovative Research Groups of the National Natural Science Foundation of China(No.,51621092)and the National Natural Science Foundation of China(No.,51439005).

更新日期/Last Update: 2018-10-10