PDF下载 分享
[1]苏凯,杨子娟,伍鹤皋,等.缝隙对钢衬钢筋混凝土管道结构承载特性的影响研究[J].天津大学学报(自然科学版),2018,(09):967-976.[doi:10.11784/tdxbz201709009]
 Su Kai,Yang Zijuan,Wu Hegao,et al.Influence of Gap on Bearing Mechanism of Steel-Lined Reinforced Concrete Penstock[J].Journal of Tianjin University,2018,(09):967-976.[doi:10.11784/tdxbz201709009]
点击复制

缝隙对钢衬钢筋混凝土管道结构承载特性的影响研究

参考文献/References:

[1] 董哲仁, 张武. 三峡大坝下游坝面钢衬钢筋混凝土管的结构分析[J]. 水力发电, 1991(8):49-51.
Dong Zheren, Zhang Wu. Structural analysis of steel-lined reinforcement concrete penstock on downstream dam surface at TGP[J]. Water Power, 1991(8):49-51(in Chinese).
[2] 董哲仁, 董福品, 鲁一晖. 钢衬钢筋混凝土压力管道混凝土裂缝宽度数学模型[J]. 水力发电, 1996(5):39-42.
Dong Zheren, Dong Fupin, Lu Yihui. Mathematics model of concrete crack width on the steel-lined reinforcement concrete penstock[J]. Water Power, 1996(5):39-42(in Chinese).
[3] 龚国芝, 张伟, 伍鹤皋, 等. 钢衬钢筋混凝土压力管道外包混凝土的裂缝控制研究[J]. 岩土力学, 2007, 28(1):51-56.
Gong Guozhi, Zhang Wei, Wu Hegao, et al. Study on crack control of concrete wall of steel lined reinforced concrete penstocks[J]. Rock and Soil Mechanics, 2007, 28(1):51-56(in Chinese).
[4] 伍鹤皋, 张伟, 苏凯. 坝后背管外包混凝土厚度研究[J]. 水利学报, 2006, 37(9):1085-1091.
Wu Hegao, Zhang Wei, Su Kai. Study on wall thickness of steel lined reinforced concrete penstock laid on downstream surface of dam[J]. Journal of Hydraulic Engineering, 2006, 37(9):1085-1091(in Chinese).
[5] 董哲仁. 下游坝面压力管道的优化设计[J]. 水利学报, 1987(4):62-67.
Dong Zheren. The optimized design of penstocks in the downstream of dams[J]. Journal of Hydraulic Engineering, 1987(4):62-67(in Chinese).
[6] 张伟, 伍鹤皋. 考虑混凝土软化和分期施工的坝后背管非线性分析[J]. 水力发电学报, 2008, 27(6):73-78.
Zhang Wei, Wu Hegao. Nonlinear analysis on penstock laid on downstream surface of dams with considering softening of concrete and stage construction[J]. Journal of Hydroelectric Engineering, 2008, 27(6):73-78(in Chinese).
[7] 石长征, 伍鹤皋. 水电站坝下游面钢衬钢筋混凝土管道损伤和承载特性[J]. 天津大学学报:自然科学与工程技术版, 2014, 47(12):1081-1087.
Shi Changzheng, Wu Hegao. Damage and bearing characteristics of steel lined reinforced concrete penstock on downstream face of dam in hydropower station[J]. Journal of Tianjin University:Science and Technology, 2014, 47(12):1081-1087(in Chinese).
[8] 苏凯, 张伟, 伍鹤皋, 等. 考虑摩擦接触特性的钢衬钢筋混凝土管道承载机理研究[J]. 水利学报, 2016, 47(8):1070-1078.
Su Kai, Zhang Wei, Wu Hegao, et al. Bearing mechanism of reinforced concrete penstock with steel liner considering friction-contact behavior[J]. Journal of Hydraulic Engineering, 2016, 47(8):1070-1078(in Chinese).
[9] 马善定. 混凝土坝下游面压力管道在内水压作用下的应力分析[J]. 水利学报, 1986(7):23-30.
Ma Shanding. Stress analysis of reinforced concrete penstocks with steel lining on the downstream surface of concrete dam under internal water pressure[J]. Journal of Hydraulic Engineering, 1986(7):23-30(in Chinese).
[10] 汪艳青, 伍鹤皋, 苏凯. 钢衬钢筋混凝土岔管三维非线性数值分析[J]. 人民珠江, 2011, 32(1):33-35.
Wang Yanqing, Wu Hegao, Su Kai. Three-dimensional nonlinear numerical analysis of steel lined reinforced concrete bifurcated penstock[J]. Pearl River, 2011, 32(1):33-35(in Chinese).
[11] 申艳, 伍鹤皋, 蒋逵超. 大型抽水蓄能电站充水保压蜗壳结构分析[J]. 华中科技大学学报:自然科学版, 2008, 36(5):97-99.
Shen Yan, Wu Hegao, Jiang Kuichao. Research on preloading filling spiral case structure in large pumped storage power station[J]. Journal of Huazhong University of Science and Technology:Natural Science Edition, 2008, 36(5):97-99(in Chinese).
[12] 聂金育, 伍鹤皋, 苏凯. 抽水蓄能电站蜗壳保压值优化研究[J]. 水电能源科学, 2009, 27(1):151-154.
Nie Jinyu, Wu Hegao, Su Kai. Study on optimizing precast water head of spiral case at pumped-storage power plant[J]. Water Resources and Power, 2009, 27(1):151-154(in Chinese).
[13] 郭涛, 张立翔, 李世杰. 基于非均匀缝隙的充水保压蜗壳三维仿真算法研究[J]. 水利学报, 2015, 46(12):1434-1443.
Guo Tao, Zhang Lixiang, Li Shijie. Research on three-dimensional simulation algorithm of preloaded filling spiral case with non-uniform gap[J]. Journal of Hydraulic Engineering, 2015, 46(12):1434-1443(in Chinese).
[14] 许新勇, 李敏芝, 马震岳, 等. 基于非均匀间隙的充水保压蜗壳施工仿真分析[J]. 水力发电学报, 2009, 28(4):75-80.
Xu Xinyong, Li Minzhi, Ma Zhenyue, et al. Simulation and analysis of the constant internal pressure spiral case with non-uniform gap[J]. Journal of Hydroelectric Engineering, 2009, 28(4):75-80(in Chinese).
[15] SL281—2003水电站压力钢管设计规范[S]. 北京:中国水利水电出版社, 2003.
SL281—2003Design Code for Steel Penstock of Hydroelectric Station[S]. Beijing:China Water & Power Press, 2003(in Chinese).
[16] Simulia. Abaqus Theory Manual[M]. version 6.10. Providence, RI:Dassault Systèmes Simulia Corp, 2010.
[17] 姜庆远, 叶燕春, 刘宗仁. 弥散裂缝模型的应用探讨[J]. 土木工程学报, 2008, 41(2):81-85.
Jiang Qingyuan, Ye Yanchun, Liu Zongren. Investigation on applying the smeared crack model[J]. China Civil Engineering Journal, 2008, 41(2):81-85(in Chinese).
[18] 沈新普, 王琛元, 周琳. 一个钢筋混凝土损伤塑性本构模型及工程应用[J]. 工程力学, 2007, 24(9):122-128.
Shen Xinpu, Wang Chenyuan, Zhou Lin. A damage plastic constitutive model for reinforced concrete and its engineering application[J]. Engineering Mechanics, 2007, 24(9):122-128(in Chinese).
[19] 张运良, 马震岳, 程国瑞, 等. 水轮机蜗壳不同埋设方式的流道结构刚强度分析[J]. 水利学报, 2006, 37(10):1206-1211.
Zhang Yunliang, Ma Zhenyue, Cheng Guorui, et al. Strength and stiffness analysis of spiral casing with different embedded manners[J]. Journal of Hydraulic Engineering, 2006, 37(10):1206-1211(in Chinese).
[20] 孙海清, 伍鹤皋, 郝军刚, 等. 接触滑移对不同埋设方式蜗壳结构应力的影响分析[J]. 水利学报, 2010, 41(5):619-623.
Sun Haiqing, Wu Hegao, Hao Jungang, et al. Analysis on influences of contact slippage on stress of spiral cases with different embedded manners[J]. Journal of Hydraulic Engineering, 2010, 41(5):619-623(in Chinese).
[21] 王向东. 混凝土损伤理论在水工结构仿真分析中的应用[D]. 南京:河海大学土木工程学院, 2004.
Wang Xiangdong. Application of Concrete Damage Theory in the Simulation of Hydraulic Structure [D]. Nanjing:College of Civil Engineering, Hohai University, 2004(in Chinese).
[22] 傅金筑. 水电站坝后背管结构及外包混凝土裂缝研究[M]. 北京:中国水利水电出版社, 2007.
Fu Jinzhu. Studies on Structure of Penstocks on Downstream Dam Surface and Surrounding Concrete Fracture[M]. Beijing:China Water & Power Press, 2007(in Chinese).

相似文献/References:

[1]于 跃,张启灵,伍鹤皋.水电站垫层蜗壳配筋计算[J].天津大学学报(自然科学版),2009,(08):673.
 YU Yue,ZHANG Qi-ling,WU He-gao.Reinforcement Calculation for Spiral Case Embedded with Cushion Layer of Hydropower Station[J].Journal of Tianjin University,2009,(09):673.
[2]冯平,李绍飞,安伟哲,等.三门峡水库电站运行调度的优化研究[J].天津大学学报(自然科学版),2004,(04):294.
[3]练继建,李辉.李家峡双排机水电站厂内经济运行研究[J].天津大学学报(自然科学版),2006,(05):523.
[4]练继建,喻刚,王海军.温度变化对水电站蜗壳结构配筋的影响[J].天津大学学报(自然科学版),2006,(08):957.
[5]伍鹤皋,黄小艳,张启灵,等.水电站直埋蜗壳结构受力特性与承载力[J].天津大学学报(自然科学版),2008,(07):777.
[6]钟登华,谷金操,佟大威. 水电站厂房及设备可视化交互仿真建模方法与应用[J].天津大学学报(自然科学版),2014,(02):95.[doi:10.11784/tdxbz201206048]
 Zhong Denghua,Gu Jincao,Tong Dawei. Method and Application of Visual Interactive Simulation Modeling for Hydropower House and Its Equipment[J].Journal of Tianjin University,2014,(09):95.[doi:10.11784/tdxbz201206048]
[7]舒扬棨,李大成.埧内式水電站重力埧(空心重力埧)自振特性的理论分析与实验研究[J].天津大学学报(自然科学版),1962,(00):75.

备注/Memo

收稿日期: 2017-09-08; 修回日期: 2018-01-12.
作者简介: 苏凯(1977—), 男, 博士, 副教授, suker8044@163.com.
通讯作者: 伍鹤皋, wbf1988@vip.sina.com.
基金项目: 国家自然科学基金资助项目(51579194); 国家重点研发计划资助项目(2016YFC0401803); 中央高校基本科研业务费专项资金资助项目(2042017kf0202).
Supported by the National Natural Science Foundation of China(No.,51579194), the National Key Research and Development Program of China(No.,2016YFC0401803)and the Fundamental Research Funds for the Central Universities of China(No.,2042017kf0202).

更新日期/Last Update: 2018-09-10